Skip to main content

Tasks Troubleshooting: Save Errors, Dates, Missing Tasks, and CRM Status

Written by Taylor Stewart

Check a Task’s saved details and sending status before recreating missing work or retrying a failed creation. This article covers Task save errors, dates, search, and CRM copies. For creation, assignments, sorting, portal and Guide visibility, and completion, read Tasks: Create, Assign, and Track Client Work.

What should I do if the New task form reports an error?

If a New task form says “Task could not be created. Try again.”, keep the draft and avoid selecting Create again immediately. A retry can create a second Task. This applies to the form from a household header, from Add task on a note, and the "New task" pop-up from the practice Tasks page or Kerdora's Home page.

  1. Copy the description, assignee, and due date somewhere you can keep them while the save problem is checked.

  2. Note the household, the error message, and when it happened. A Task appearing in Office → Tasks isn't proof that it saved successfully.

  3. Contact Kerdora Support with those details before recreating the Task.

After some connection or server failures, the first creation can remain pending and save later. Selecting Create again starts another Task rather than retrying the same record. Closing the form with Cancel clears its draft; it doesn't undo a creation already attempted.

Keep the original work details until you know which record was saved.

Dora is using the wrong year for tasks. How do I check or correct a due date?

For a Task with an incorrect date, check its saved due date, including year, in its household’s Office → Tasks page or practice Tasks. Editing the saved date corrects that Task; it doesn't diagnose why Dora chose the date.

  1. Open the household's Office → Tasks and find the Task.

  2. Select its existing date in Due date, or Add due date… if no date is set.

  3. In the calendar, select the year beside the month name, choose the intended year, and select the intended day. Use the calendar arrows to change months if needed.

  4. After the calendar closes, check the full date displayed in the row, including the year.

Changing the calendar's year alone only changes which dates you are viewing; select a day to set the Task's date. Choosing a day closes the calendar and saves the new date; there is no separate Save button.

To remove a deadline in Office Tasks or the practice Tasks page, select the row with its selection checkbox, then choose Due date → Clear due date in the selection bar. This saves immediately and offers Undo.

An unfinished Task with a date before today is overdue. A Task due today isn't included by the Overdue filter. For a recurring Dora date problem, use Dora Troubleshooting: Missing Sources, Wrong Dates, and Stalled Replies; include the requested date and the date actually saved.

Why can't I find a Task in my Tasks list?

A search or filter on the practice Tasks page or a household's Office → Tasks is the most common reason a Task seems missing. Search and filters narrow that list without changing any Task. Check these before recreating work:

  1. Remove the search text.

  2. Remove each filter chip above the list with its X. Clear all shows only when 2 or more filters are on. You can also select the funnel icon, labelled “Filter tasks” (“Sort and filter tasks” on a phone), and choose Clear.

  3. Expand Completed. Open and completed Tasks are separate groups.

  4. If the practice list still looks incomplete, open the household's own Office → Tasks, the household that owns the Task.

“No open tasks in this view.” or “No open tasks match this view.” means a search or filter is hiding Tasks. The Household choice in the Assignee filter means every non-advisor assignment, not 1 selected person. For each search and filter control, see Tasks: Create, Assign, and Track Client Work.

Why does a Task show a CRM logo or CRM status?

A CRM logo beside a Task means Kerdora is sending or maintaining a copy in a connected CRM. Open that Task’s Office → Tasks drawer to read its CRM status. Slant is available to every advisor.

Wealthbox in Kerdora is in a pilot for selected practices. If Wealthbox isn't listed in Advisor Settings → Integrations, contact Kerdora Support to ask for access.

With Send tasks to Slant or Send tasks to Wealthbox on and a household linked, new advisor-assigned Tasks go to that CRM. Older Tasks don’t go automatically. Under that switch, Kerdora counts eligible older open Tasks and offers Send them, or Send it for 1 Task. That switch is in the CRM's drawer: open your user menu, choose Integrations, then the Slant or Wealthbox row.

New Tasks assigned to household members don't get a first CRM copy. A Task already copied to a CRM keeps sending description, due-date, and completion changes after reassignment to a household member. Reassignment in Kerdora doesn't assign that CRM copy to the client. Clients don't see CRM status or CRM records in their portal.

With sending active, deleting a Kerdora Task also deletes its open CRM copy. A completed CRM copy remains as a record.

Check a Task’s CRM field before assuming a logo proves a send has finished. For setup, read Slant: Connect Your CRM, Import Households, and Sync Notes, Tasks, and Meetings.

What do the CRM messages in a Task’s drawer mean?

A Task’s CRM field in Office → Tasks reports its copy’s sending state. “Sending to Slant…” means sending is pending or underway; “In Slant” means a copy was recorded there. Wealthbox uses the same messages with its name.

  • “Couldn’t send to” means sending failed. Read the status tooltip, repair a connection if requested, then select Retry.

  • “Deleted in” means someone removed that CRM copy. Kerdora stops updating it there; Send again requests another copy.

  • “Won’t go to” means this item was excluded; Send enables sending. “Not updated in” means updates stopped for an existing copy; Resume enables them again.

  • “Completed in Slant,” “Reopened in Slant,” or “Edited in Slant” means a change from Slant was brought into the Kerdora Task, with a relative timestamp.

  • “Assigned to [name] in Slant” identifies the CRM copy’s assignee. It doesn’t change the person selected for that Task in Kerdora.

Slant can return title, due-date, and completion changes for linked Task copies. Wealthbox doesn’t provide that return flow. If a retry keeps failing, use Slant Troubleshooting: Missing Households, Notes, Tasks, or Meetings or contact Kerdora Support with the household, Task description, and CRM message.

Why does a Task in Slant or Wealthbox have a due date I didn't set?

When Kerdora sends a Task with no due date to Slant or Wealthbox, that CRM copy is due on the day the Task was created. Kerdora keeps the Task undated on its own side. This applies only to Tasks Kerdora sends, which needs Send tasks to Slant or Send tasks to Wealthbox on in that CRM's drawer under Integrations and a linked household.

Set a due date on the Task in Kerdora's Office → Tasks when that default would mislead your team in the CRM. Kerdora then sends the new date to the CRM copy.

Did this answer your question?